首页 体育内容详情
Kelana Jaya LRT line to be fully operational earlier than expected

Kelana Jaya LRT line to be fully operational earlier than expected

分类:体育

标签: # 足球投注app

网址:

SEO查询: 爱站网 站长工具

点击直达

以太坊单双博彩游戏www.eth108.vip)采用以太坊区块链高度哈希值作为统计数据,以太坊单双博彩游戏数据开源、公平、无任何作弊可能性。

Caretaker prime minister Ismail Sabri Yaakob says all safety and automatic train control systems along the Gombak-Putra Heights route are stable. – The Malaysian Insight file pic, November 13, 2022.

CARETAKER prime minister Ismail Sabri Yaakob today said the Kelana Jaya light rail transit (LRT) line is expected to resume operations earlier than the original completion date of November 15. 

He said thus far, all safety and automatic train control systems are stable, based on data from tests conducted using 38 train sets along the Gombak-Putra Heights route. 

“The signal and communication system is being tested, and will be tested again tonight, to ensure that the LRT is ready to resume operations safely, earlier than November 15,” he said at a press conference after attending a programme with residents in Kampung Batu Papan in Bera today. 

Ismail said the Transport Ministry has been instructed to conduct a comprehensive investigation to identify the cause of the incident, through the establishment of a special committee.

,

kiếm tiền online miễn phí(www.vng.app):kiếm tiền online miễn phí(www.vng.app) cổng Chơi tài xỉu uy tín nhất việt nam。kiếm tiền online miễn phí(www.vng.app)game tài Xỉu đánh bạc online công bằng nhất,kiếm tiền online miễn phí(www.vng.app)cổng game không thể dự đoán can thiệp,mở thưởng bằng blockchain ,đảm bảo kết quả công bằng.

,

He said it is the second time such an incident had occurred during his tenure as prime minister, and that he does not want a recurrence because it inconveniences public transport users. 

“We will do a thorough investigation. We do not want this to recur because it burdens the people,” he said.

Previously, Prasarana Malaysia Bhd announced that the LRT service between the Kelana Jaya and Ampang Park stations would be suspended for seven days from November 9 to Tuesday, following the service being found to be unstable. 

The temporary suspension was announced after taking into account passenger safety factors as well as the time taken to identify the cause of the service disruption.

The Kelana Jaya LRT line now only operates from Gombak to Damai and from Lembah Subang to Putra Heights. – Bernama, November 13, 2022.


转载说明:本文转载自Sunbet。,

Hga030www.hg108.vip)是一个开放皇冠即时比分、代理最新登录线路、会员最新登录线路、皇冠代理APP下载、皇冠会员APP下载、皇冠线路APP下载、皇冠电脑版下载、皇冠手机版下载的皇冠新现金网平台。Hga030上登录线路最新、新2皇冠网址更新最快,Hga030开放皇冠会员注册、皇冠代理开户等业务。

 当前暂无评论,快来抢沙发吧~

发布评论